Sunday, 10 December 2017

Well Control Simulator

Well Control Simulator (iPad)

We are proud to announce a new, mobile well control simulator, allowing all IADC and IWCF well control students review simulation exercises before, during, and after both online and classroom well control training.

Currently, our simulator covers Driller’s Method on the iPad. We are adding a ton of new, cool features to be able to do all IADC Driller and Supervisor simulations on all mobile devices and the web. Read on to learn more!

Simulator Features

Mobile Well Control Simulator
Simulator to be accessible on iPad, iPhone, Android, and Web

All IADC Driller & Supervisor Level Simulations
All IADC WellSharp Driller and Supervisory simulations as well as Coiled Tubing and Wireline simulation.

Learn, Practice, and Test Modes

FAQ



What is the value of a mobile well control simulator?

1. Increase student simulator time in the classroom:
Each student will have individual simulator access with unlimited time before, during and after class.
2. Review and refresh anytime, anywhere in the field
Increased student competency between the two (2)-year well control training cycle.

3. Practice to perfection
Intuitive, easy-to-use platform allows for unlimited practice without requiring an instructor.


What are the different ways students can go through the simulation?

Supports three (3) separate modes of simulation:
Learn Mode: Animated, e-learning to refresh concepts
Practice Mode: Guided walk through steps and situations with hints
Test Mode: Assessed, tested mode with IADC standardized grading

What data does the simulation track?

Tracking & Reporting Features

Graph of all drilling & well control values available during & after simulation. 
Student completion and quiz data available on the cloud. Generic data file for LMS 
integration. Data Analysis for trends in problem and success areas.


Phase 1 : Current Version

SimulationsFeatures
Drilling/Workover : Standpipe Manifold Line-UpiPad
Drilling/Workover : Choke Manifold Line-UpSurface Stack
Drilling/Workover : BOP Stack Line-UpGrade tied to IADC Scoring
Drilling/Workover : BOP Pressures ConfirmationQuiz Knowledge Checks
Drilling/Workover : Pump Startup with Constant BHPE-Learning Integration
Drilling/Workover : Driller's Method First CirculationBasic LMS Integration
Drilling/Workover : Driller's Method: Plugged ChokeBasic Multiplayer
Drilling/Workover : Driller's Method: Gas at the Choke

Phase 2 : July 2017

SimulationsFeatures
Drilling/Workover : Setting Pit and Flow AlarmsiPad & iPhone
Drilling/Workover : Kick Detection
Drilling/Workover : Shut-In
Coil Tubing : Tubing Pinhole at the Surface
Coil Tubing : Tubing Parts at the Surface
Coil Tubing : Tubing Parts Downhole

Phase 3 : Q4 2017

SimulationsFeatures
Drilling/Workover : Reporting SIDPP and SICP with a FloatGraphical Results of Pressures
Drilling/Workover : Driller's Method with a Subsea StackDownhole Well Visualization
Drilling/Workover : Choke Line Friction Loss MeasurementMultiple Scenarios
Drilling/Workover : Slow Circulating Rates MeasurementPush Notifications for Field Refresher
Drilling/Workover : Kill Sheet Tutorial

Phase 4 : 2018

SimulationsFeatures
Drilling/Workover : Wait and Weight MethodRandomized Complications
Drilling/Workover : BullheadingDownhole Well Visualization
Drilling/Workover : Driller's Method: Washed out ChokeJoystick Connection for Choke
Drilling/Workover : Driller's Method: Plugged Bit Nozzles
Drilling/Workover : Driller's Method: BOP Leak
Drilling/Workover : Driller's Method: Pump Failure

Disqus Comments

Follow by Email