A casing head spool adds a support and pressure-containment stage to a conventional surface wellhead. The useful part of a cross-section is the space between the seals. Trace that space to a named port and you can explain what its gauge sees, which casing string the bowl supports, and what a successful test actually covers.
Read the spool from bottom to top
The lower connector mates with the head or spool below. Depending on the system, a seal in the lower section packs off around the outside of the previously installed casing. A ring gasket at the flange seals a different interface: the joint between two pieces of equipment. The drawing must distinguish the annular seal around the pipe from the flange seal around the connector opening.
Farther up, the spool body contains the mating profile for the next casing hanger. In a slip assembly the load reaches the bowl through the slip backs. A mandrel design supplies its own bearing profile. The top connector joins the next stage of equipment. For example, Cameron specifies a 45° load shoulder in its IC straight-bore system and lists IC-2, IC-2-BP and IC-2-L spool variants. The product family also permits different secondary seals and packoff bushings. An 11-in nominal size alone therefore leaves the required packing assembly unresolved. Match the hanger and packing assembly to the spool part number and section drawing.

Distinguish service outlets from verification ports
A side outlet may access the annular volume between two strings. A smaller test passage can lead to a confined cavity between seals. A plug or valve fitted to one does not establish where the other terminates. Similarly, a lockdown screw or retainer has a model-specific function. Trace the drilling in the spool body and find the manufacturer’s port designation.
Imagine a spool between a lower casing head and a tubing head. On the supplied drawing, outlet A opens below the new casing-hanger packoff, whereas port T ends between the seals in the lower packing assembly. An observation at A describes the connected annulus under the recorded lineup. A test through T examines its designated cavity and bounding seals. A good result at T does not by itself establish the condition of every barrier below A.
For components that contact the spool during drilling and workover, see wellhead wear bushings and casing running practices. Trace the supported string separately from any annulus monitored at an outlet.

Keep the bowl and bore fit for their next functions
A wear bushing, when installed, protects critical internal surfaces during drilling through the spool. The matching retrieval and running tools, bore restrictions and retainer positions belong on the same equipment drawing. In the conventional spool arrangement illustrated by Heriot-Watt, the bushing occupies the protected bore during drilling and is recovered before the next casing string runs. Record that recovery and the condition of the exposed seat before interpreting a subsequent hanger landing.
Before accepting equipment for the next operation, confirm the as-built bore, bowl and part-number match. Record inspection or redress status of the sealing and landing surfaces and any installation-specific restrictions. A damaged seal bore can compromise pressure isolation while the shoulder still carries load. A damaged shoulder can compromise support with no visible leakage at a static connector.


Create a port map that survives shift change
For each connection, record the port tag, upstream volume, adjacent boundaries, instrument or valve fitted, and drawing revision. Include the smaller ports even when they normally carry plugs. Mark which items are accessible only during installation. A port map should let another supervisor explain a recorded pressure without relying on phrases such as left valve or middle spool.
Name the annulus by its two strings before assigning a port
On an illustrative completion with 3½-in tubing inside 7-in production casing and 9⅝-in intermediate casing outside it, the A-annulus conventionally lies between tubing and 7-in casing. The B-annulus lies between the 7-in and 9⅝-in strings. A side outlet below the 7-in casing-hanger seal can communicate with B if the as-built porting shows a route there. A test port ending between two local seals cannot be treated as that same annulus.
On the drawing write the outlet tag, both bounding strings, and the seals or valves on the traced path. Compact heads can route a passage internally to a different elevation. Verify the installed design and site naming convention rather than assigning A or B from the height or handle position of a valve.
Field comparison
| Spool feature | What to trace | Mistake to avoid |
|---|---|---|
| Lower packing assembly | Interface around the preceding casing | Treating it as the flange ring |
| Hanger bowl | Profile carrying the next string | Identifying it from flange OD |
| Annulus outlet | Full path to named annulus | Calling it a seal-test port |
| Test passage | Confined test cavity and bounding seals | Crediting unrelated barriers |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Record the two adjacent strings and corresponding annulus name. | |
| Trace and label every service outlet, test passage, retainer and plugged connection. | |
| Cross-reference each accepted pressure test to the exact cavity and drawing revision. |
Additional technical figures (5)





Questions from the field
Is a casing head spool the first casing head?
A conventional starting casing head attaches to the outer casing. An intermediate spool is installed above a previous stage to support and isolate another string.
Does every casing spool have the same secondary seal?
No. Different wellhead families offer different lower packing assemblies and seal materials. Use the actual bill of materials.
Does the upper connector pressure rating apply throughout the spool?
Use the certified pressure boundaries on the manufacturer’s drawing. Certain crossover designs have different qualified regions above and below a seal.

Technical references
Mike Speer, Introduction to Wellhead Systems, SPE Petroleum Engineering Handbook, Volume II. Chapter 8, PDF pp. 350–354, sections 8.1.1–8.1.3 and Figs. 8.1–8.8.
Cameron IC conventional wellhead system. Flexible configurations and specifications.
Heriot-Watt University, Drilling Engineering. Casing chapter, section 6.1 Spool Type Wellhead, PDF pp. 288–290.