A subsea test tree (SSTT) is a pressure-control and disconnect assembly in a landing or test string, commonly positioned within the subsea BOP envelope. It allows the wellbore to be isolated and the upper landing string to separate at a defined point. The lower isolation valves, disconnect latch and upper retainer serve different fluid volumes and mechanical functions.
Draw three regions before identifying any valve
Start below the SSTT, with the well-connected volume inside the tubing or test string. Above the lower closure elements is the latch region and, higher up, the upper landing-string volume extending toward the vessel. Outside the string is a separate path through the BOP and riser. The SSTT elements control the inside of the string. BOP elements interact with the string exterior or with the bore under specified conditions.
Specific products combine these duties differently. SLB describes a SenTREE configuration with independently controlled ball and flapper elements, a hydraulic latch, a bleedoff module and a retainer valve. The lower devices control well-connected fluid. The retainer can hold fluid in the upper string after a separation when used in its qualified configuration. It matters which side of the latch a valve is on. A retainer above the latch cannot provide the lower well isolation once the two sides separate.

Match the string drawing to the BOP drawing
Put both drawings on one vertical datum. Mark the landing point, space-out dimensions, valve and latch positions, ram closure planes and the location of plain or specially designed sections. A component that passes through the BOP bore may still obstruct a planned ram or lie outside the qualified cut/seal window. Geometric clearance, closure around a component and demonstrated cutting capability are separate checks.
Also draw the conveyed media. Wireline, coiled tubing, a rigid tool body and an empty bore present different conditions at a closure plane. Qualifying a device for a particular line or tubing does not automatically qualify another diameter, material or tool joint. The job-specific shear assessment and current hardware configuration govern the credited function.
Compare the test-tree location with a subsurface safety valve and the BOP rams. All three can appear on a well test drawing, at different elevations and with different duties.

Worked drawing review: the good space-out belongs to yesterday’s tally
Suppose two controlled drawings use the same landing reference. A target closure plane is dimensioned 2.80 m above it. The approved plain section of the string covers 2.65–2.95 m on the original tally, putting the nominal plane 0.15 m from either nominal boundary. A replacement spacer moves that section upward by 0.20 m. On the revised tally its range is 2.85–3.15 m. The target is now 0.05 m outside the nominal range even before tolerances.
This is a geometry example only. A complete reconciliation considers ram element width, actual component dimensions, stack and tool tolerances, movement and the approved design margins. Record the datum and sign convention before applying corrections. The example’s purpose is to catch an invalid drawing revision, not to define an allowable spacing.
End the review with three separate questions. What controls the well-connected volume below the latch? What contains or manages the upper-string contents? What remains across each BOP or SSTT closure plane in the activity being reviewed? Each answer should point to specific installed hardware and current verification.


Estimate fluid inventory above the release point
Consider 80 m of upper string with a uniform clear ID of 76 mm. Its geometric internal volume is π × 0.076² × 80 ÷ 4 = 0.363 m³, approximately 363 L. This is the inventory in that modeled section, not a predicted discharge. The actual tally can contain different IDs, occupied volumes and branches. Fluid properties and pressure also matter when interpreting inventory.
Mark the retainer valve, latch plane and lower isolation element on the same controlled section. Identify which volume lies above each closed element, whether a conveyed line or tool changes the closure qualification, and where pressure is measured. A latch-position indication gives no direct evidence that the retained volume was isolated successfully.
Distinguish the subsea test tree from two similarly named assemblies
A landing-string subsea test tree provides a temporary isolation and disconnect function in the landing string. A production tree controls flow from the completed well and has a different installation and service life. A surface test tree sits at the surface end of a test string. Mark the rig floor, subsea BOP and wellhead on the same sketch, then place the test tree and its latch at the elevation shown on the landing-string drawing. Confusing the three can put a claimed isolation boundary on the wrong side of the release point.
Field comparison
| Element | Main question it answers | Key cross-check |
|---|---|---|
| Lower SSTT valve or valves | How is the well-connected internal bore isolated? | Actual valve types, media and verification |
| Latch | Where does upper string separate? | Mating components and reconnect profile |
| Retainer valve | How are upper-string contents managed? | Location relative to latch and conveyed line |
| Slick or shear section | What is opposite the selected BOP element? | Stack datum, string tally and qualification |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Use as-built BOP dimensions and made-up landing-string tally on one datum. | |
| Mark lower valves, upper retainer, latch and BOP closure planes. | |
| List conveyed media that could be present at each plane. | |
| Record qualified capabilities, configuration changes and remaining margin with tolerances. |
Additional technical figures (5)





Questions from the field
Is a subsea test tree the permanent production tree?
No. The SSTT belongs to the temporary landing or test string. A production tree is installed at the well to control production or injection and provide access.
Does every subsea test tree shear every wire or coiled tube?
Shearing depends on the specific valve or device and the qualified material, size and conditions. The actual intervention toolstring can include sections outside that envelope.
Does releasing the SSTT latch disconnect the marine riser?
The SSTT separates the inner landing string. The outer riser/LMRP has a separate mechanical interface and controls. The well-specific program coordinates them where necessary.

Technical references
SLB, SenTREE 7 completion subsea test tree. System description and modular components.
Society for Underwater Technology, Wellheads and Trees slide pack. Landing String (LS) and Subsea Test Tree (SSTT) diagram.