To identify subsea tree components, start at the tubing hanger and trace a continuous path to the production jumper. Then trace the annulus separately. This approach explains the location of a master valve, wing valve or choke even when an equipment supplier uses different tags or the tree drawing is turned on its side.
Trace production, annulus and vertical access separately
In a typical vertical tree, produced fluid enters through the tubing-hanger production bore and passes the production master valve before turning toward the wing outlet. The wing valve isolates that branch. A choke in the production route provides an adjustable or fixed restriction. The order and location of additional valves, pressure taps and the choke belong on the installation-specific schematic. A pressure reading is meaningful only once its tap is on the correct side of those devices.
The annulus route communicates with the space outside the production tubing. It has its own valves and monitoring points where provided. A controlled crossover may connect the annulus and production paths for particular operations. The swab or access valve on a conventional vertical production bore provides entry from above. These paths can share a block of steel while serving separate functions.

Vertical and horizontal describe the completion layout
In a conventional vertical tree, the tubing hanger lands below the tree in the wellhead or a tubing head spool. The tree can generally be removed while the hanger and tubing remain in place, subject to the well’s isolation arrangements. In a conventional horizontal tree the tubing hanger lands within the tree body. Flow exits the hanger laterally and the tubing can be recovered through the top of the tree. Taking the tree itself out of service has different implications because of that hanger location.
Outside the bores, the tree connector secures and seals the tree to its receiving profile. The frame supports and protects external equipment. The subsea control module distributes control functions and reports measurements, while the actuator converts supplied energy into valve movement. A tag describing the module does not identify the physical valve or the fluid volume that a pressure sensor sees.
Relate the tree flow paths to the completion design and the surface-controlled subsurface safety valve. The safety valve sits downhole and has a separate function and verification record.

Field example: two pressure readings beside the choke
Assume synchronized gauges show 210 bar immediately upstream of the production choke and 175 bar immediately downstream, using the same reference. Their indicated difference is 35 bar. If the downstream instrument actually sits beyond the jumper and manifold branch, the same arithmetic gives a 35-bar difference between the taps. It now includes the intervening equipment and line, so assigning the full difference to the choke would be premature.
Mark the tap locations, timestamp, valve lineup, choke position and flow conditions on a clean schematic. If the well is isolated or the data are stale, the pressure pair can answer a different question. A static gauge near the wing outlet can represent a trapped volume. It should not be silently treated as a flowing tubing pressure.


Locate the missing pressure loss with a third tap
Consider synchronized readings of 210 bar at the choke inlet, 190 bar immediately after the choke and 175 bar at the manifold entry. On a common reference, the indicated inlet-to-outlet difference is 20 bar and the outlet-to-manifold difference is 15 bar. The two sum to the 35-bar end-to-end difference. This additional measurement changes the interpretation even though the original two instruments read exactly the same values.
Record the routing and which branch is flowing. Pressure differences across separated elevations can contain hydrostatic head as well as friction and local losses. In transient or multiphase flow, a surface sample rate or a later pressure reading may not describe the same state. Keep a valve-position indication, a measured differential and a seat-leak verification as distinct observations.
Read the hanger location before naming a horizontal or vertical tree
In the conventional vertical-tree arrangement illustrated by the Society for Underwater Technology, the tubing hanger lands before the tree is installed. In the illustrated horizontal arrangement the tree is installed first, then the tubing hanger lands in it. That changes which assembly carries the hanger when someone proposes pulling the completion or retrieving the tree.
On the horizontal tree illustrated by Bai and Bai, production exits the tubing hanger through a side port. The vertical access bore above that port has its own closures. One arrangement uses a crown plug in the hanger with a pressure-containing internal tree cap above it. Another uses two crown plugs. Locate both closure profiles and their verification records before recording the state of vertical access. The external debris cap is a separate component. See Subsea Engineering Handbook, pp. 737–738, Figs. 22-22 and 22-23.
Field comparison
| Component | Job on a typical production tree | Drawing detail to locate |
|---|---|---|
| Production master valve | Isolates the main production path | Connection between tubing and branch |
| Production wing valve | Isolates the production outlet | Outlet to choke or jumper |
| Choke | Controls restriction in the flow path | Upstream and downstream taps |
| Annulus valves | Manage access to the tubing annulus | Annulus route and any crossover |
| Tree connector | Locks and seals the tree to its base | Mating profile and gasket |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Identify the tree type and actual tubing-hanger landing location. | |
| Highlight production, annulus, crossover and vertical access separately. | |
| Identify each pressure tap by upstream and downstream neighbors. | |
| Distinguish command, valve-position information and process pressure on the marked-up drawing. |
Additional technical figures (5)





Questions from the field
Does every subsea tree have the choke in the same place?
No. A choke may be on the tree or elsewhere in the system. Locate it on the project process drawing before interpreting pressures.
Is the wing valve used to throttle production?
The choke is the designated restriction in a conventional tree. The intended service and operating limits of each installed valve come from its design documents.
What is the quickest way to identify a horizontal tree?
Look for a tubing hanger landed within the tree body and a lateral production outlet from the hanger. The direction of a single external pipe is an unreliable shortcut.

Technical references
Yong Bai and Qiang Bai, Subsea Engineering Handbook. Chapter 22, printed pp. 729–731 and 744–747, especially Figs. 22-15, 22-17 and 22-30.
Subsea tree reference on production flow paths and controls.
Society for Underwater Technology, Installations and Interventions, subsea installation order.