Well intervention barrier verification establishes whether the actual barrier elements can perform their assigned functions in the current well configuration. A pressure chart can support that decision only when the team knows what it pressurized, which side could reveal leakage, and what the agreed acceptance criteria were. Start with the flow path rather than the certificate number.
Draw one operating state at a time
For the phase under review, mark the source of potential flow, destination, completion geometry and all paths connecting them. Include the tubing bore, annular routes and pressure-control side outlets when applicable. Then identify the elements forming each intended barrier envelope. A closed component drawn in a previous phase may be physically occupied by a toolstring or required to remain open in the next.
The drawing is a claim about the installed equipment. Record identifiers, actual line or pipe size and verified equipment positioning. If an element is shared by two proposed envelopes, identify the dependency explicitly and assess it against the approved well design and applicable requirements. Relabeling one item on a second line of the drawing adds no physical independence.

Match the evidence to the required function
A function test shows that a device responds as tested. A position indicator can confirm a commanded position. A pressure or inflow test evaluates a boundary under a specified differential and direction. Verification of condition, dimensions or installation provides other evidence. Which combination is acceptable depends on the barrier element, its required function and the governing program.
For a pressure test, the record should identify gauge locations, test medium, both sides of the boundary, stabilization and acceptance criteria. Look for trapped volumes, closed branches and paths into unmonitored spaces. Verify what change on the downstream side would have been detectable. A calibrated upstream gauge cannot report leakage that the arrangement prevents it from revealing.
The well integrity and barrier guide defines the envelope. The well-control checks guide gives examples of the records available to substantiate an individual element.

Worked example: two shut valves and one observation
Imagine valves A and B in series with a cavity between them. A test applies pressure upstream of A and observes only the space downstream of B. The intermediate cavity is unmonitored. No downstream change occurs during the observation period. That result is consistent with A holding, B holding, or both holding. By itself it cannot establish that A and B each held independently.
On the mark-up, shade exactly the tested boundary and identify the unobserved cavity. Review the approved test plan for how each required element is individually verified, in which direction and against which acceptance criteria. The example demonstrates a gap in inference. It provides no basis to change a valve lineup, disturb a barrier or select test pressures on a live well.


Make the evidence survive a shift handover
Attach the chart or recorder file to the schematic revision and identify the activity phase. Include the test start and finish, instrument identifiers, criteria, witness and conditions on both sides. Where behavior was affected by temperature stabilization or a small fluid volume, record the observation and its disposition. Do not erase an unexplained excursion by shortening the plotted interval.
When the operating state changes, identify what evidence is still applicable. Disturbing a tested connection, changing the line occupying a sealing element or moving an assembly through a closure can alter the credited configuration. A barrier register should distinguish verified, unavailable and awaiting verification, with a named owner for each open point. For example, under Norway’s Activities Regulations §85, a barrier failure restricts well activity to work intended to restore that barrier. At handover, the regulation also requires testing, verification and documentation of barrier status. Use the requirements applicable to the well when assigning actions and authorization.
Check the differential that the element actually held
Suppose synchronized gauges immediately on the two sides of an element read 3,000 and 2,400 psig, at a common elevation and reference. The applied differential is 600 psi in the direction from the first tap to the second. A record saying only “held 3,000 psi” leaves out both the downstream pressure and the test direction. If downstream pressure is unknown or the taps are separated by another closed element, this subtraction cannot establish the differential.
Keep the as-tested drawing, gauge ranges and calibration, fluid, stabilization period, time trace, applicable acceptance criteria and element-specific disposition together. Pressure decline alone is not a leak-rate measurement without a justified volume/compliance model and temperature control. Use the approved well-specific test and jurisdictional criteria for the decision.
Field comparison
| Evidence | Question it answers | Limit to record |
|---|---|---|
| Function test | Did the equipment perform the specified motion? | Pressure containment remains a separate claim |
| Pressure test | Did the defined boundary meet criteria at this differential? | Which elements and direction were actually challenged? |
| Position indication | What position was reported? | Does not demonstrate the absence of a leak path |
| Configuration check | Is the credited assembly installed as drawn? | Record what changed since the last test |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Phase, fluid source, possible destination and leak path | |
| Credited elements, common dependencies, configuration revision | |
| Differential direction, observation point and acceptance basis | |
| Evidence ID, reviewer, expiry or change invalidating credit |
Additional technical figures (5)





Questions from the field
Is a stable chart proof that both valves held?
Only the boundaries actually challenged and observed can be credited. Two valves tested in series can hide the failure of one.
Why does test direction matter?
A component may be direction-sensitive, and a test from one side can load different seals or bypasses. Match the evidence to the specified barrier duty.
Is a pressure test required for every kind of barrier?
The appropriate verification depends on the element and applicable requirements. Pressure tests, function tests, inspection and other evidence answer different questions.

Technical references
Peter Aird, Deepwater Drilling, chapter 15, Well Integrity and Barrier Requirements. Printed pp. 579–581, especially Barrier Verification on p. 581.
Well Intervention Pressure Control, training handout. PDF pp. 185–188, phase-dependent wireline equipment.
Norwegian Ocean Industry Authority, Facilities Regulations section 48. Guideline to section 48, means of verifying barrier performance.
Norwegian Ocean Industry Authority, Activities Regulations section 85. Norwegian regulatory example, section 85.