The quickest way to identify Christmas tree components is to follow three paths on the well drawing. The production path rises from the tubing and turns sideways toward the flowline. The intervention path continues up the vertical bore toward the tree cap. The tubing–casing annulus has its own outlet below the tree. These paths meet different valves and gauges. Two instruments mounted a short distance apart can therefore be measuring entirely different pressure volumes.
Read from the tubing hanger upward
The tubing hanger supports the production tubing and seals the annular interface in the tubing head. Above it, an adapter connects the wellhead to the tree according to the installed design. A conventional vertical single-bore tree typically has one or more master valves in the main bore, a tee or cross providing side branches, and a swab or crown valve above the branch. The cap closes the top access connection.
A spool assembly has visible flanged joints between components. A solid-block tree can integrate several valve cavities and passages into a common body. Counting external flange lines can therefore misidentify the internal arrangement. Use the manufacturer’s sectional drawing, valve tags and as-built flow schematic. A dual completion, a horizontal tree or an injection installation can require a different map from the simple vertical producing tree described here.

Production, access and annulus have different destinations
Trace a normal production route on paper from the tubing through the master-valve bore, along the production wing and through the choke toward the flowline. Wing isolation and flow regulation have distinct roles. On a fixed bean choke, the bean number usually gives the orifice diameter in 64ths of an inch. A 32/64-in. bean has a 0.500-in. opening. The wing gate valve and the choke body can both appear on the same branch. Identify which one carries the replaceable flow restriction before recording the choke size. A second or kill wing may provide another connection to the tree bore, depending on the design and installed piping.
Vertical access for intervention takes the straight-through route to the tree top. The pressure-control equipment interface, access bore and potential restrictions must be confirmed for the actual well. The swab valve and tree cap do not by themselves establish the approved barriers for opening the well. The tubing-head side outlet instead accesses the tubing–casing annulus. A side connection drawn slightly lower on the page can mark a major difference in the fluid path.
The wellhead back-pressure valve may appear near the tubing hanger. Compare it with the downhole safety valve when tracing independent isolation points on the well drawing.

Worked example with three plausible pressures
Suppose a well display shows 2,400 psi at a production-wing tap upstream of the choke, 1,650 psi at a tap downstream and 180 psi at the tubing-head annulus tap. If the two wing readings are contemporaneous, use the same pressure reference and represent pressure points either side of the relevant restriction, their difference is 750 psi. Additional intervening losses must be considered if the taps are far apart.
Subtracting the annulus reading from the upstream wing reading would produce 2,220 psi arithmetically, but that is not the choke differential. The third gauge belongs to a separate volume. Nor do three plausible numbers confirm that a given valve seals. To investigate a discrepancy, record the exact tag, pressure tap, units, measurement time, valve status and well state before assigning an interpretation.


Build a usable tree sketch for a handover
Start with the equipment drawing revision. Give every relevant valve and instrument its actual field tag. Identify the two sides of each item and label the point at which a branch connects to the main bore. Show the choke, nearby pressure taps and any other components between them. Draw the annulus outside the tubing and terminate its line at the correct tubing-head outlet.
For temporary intervention equipment, use a distinct line style and record the installed status. A schematic showing a possible pumping route is not a command to line it up. The operating and barrier procedures govern changes of state. An accurate handover drawing allows both shifts to discuss the same component before using those procedures.
Interpret a shut-in reading from the volume still connected to the gauge
Imagine a production-wing pressure gauge lies on the flowline side of the wing valve. After that valve closes, the gauge may still correctly indicate pressure in the isolated downstream branch. A tag reading “tree pressure” does not turn it into a shut-in tubing-head measurement. Trace the open path on the as-operated sketch and record the closure time, tap location and pressure reference.
For a deliberately simple static check, 2,400 psig at a tap actually communicating with uniform 9.0-ppg liquid would imply about 4,272 psig at a point 4,000 vertical ft below it. The 1,872-psi addition is hydrostatic head. Gas, fluid contacts, temperature changes, transients and intervening closed barriers can invalidate that projection. It is not a reservoir-pressure test.
Field comparison
| Component | Path served | What the sketch must show |
|---|---|---|
| Master valve | Vertical production bore | Exact position relative to branch and other master valves |
| Production wing and choke | Side route to flowline | Upstream and downstream instrument taps |
| Swab valve and tree cap | Vertical access | Bore, top interface and actual barriers for planned work |
| Tubing-head outlet | Tubing–casing annulus | Separate pressure volume and instrument tag |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Enter well identifier, tree design and current as-built drawing revision. | |
| Label production, vertical-access and annulus paths separately. | |
| Match field tags to every gauge and identify their pressure references. | |
| Record where temporary equipment attaches and which barrier diagram governs. |
Additional technical figures (5)





Questions from the field
Is every side valve on the wellhead a wing valve?
No. A tubing-head outlet may connect to the annulus below the tree. Trace the port to its internal volume.
Is the swab valve the choke?
The swab valve provides isolation on the vertical access path. The production choke regulates flow by imposing a restriction in the flow path.
Do all trees have two master valves and two wings?
Arrangements vary with design and service. Use the actual sectional drawing and tagged piping schematic rather than relying on valve count.

Technical references
Hossain and Al-Majed, Fundamentals of Sustainable Drilling Engineering. Printed pages 706–707, tubing hanger, surface completion and figure 12.24.
Wild Well Control, Completions and Workover. PDF pages 105–106, single and dual Christmas tree illustrations.
SLB Energy Glossary, Christmas tree. Completion equipment terminology. See also the SLB bean choke entry for fixed insert sizes.