A wireline grease injection control head contains well pressure around moving armored cable by pumping viscous grease into closely fitting flow tubes. The extended annular restriction lets the grease support a pressure gradient. Cable fit matters because a stranded exterior presents both an irregular outer surface and possible leak paths between strands.
Follow the sealing medium, not just the cable
The head sits at the top of the lubricator package. A designated injection connection supplies grease to the flow-tube assembly; a check valve can protect the supply side from reverse flow. Cable passes through the tube stack and exits the head. Depending on the design, excess grease is removed or collected above the sealing section. The injection, return and hydraulic-control lines serve different functions and belong on separate labels on the rig-up drawing.
In the NOV Enviro design, the hydraulic pack-off is intended to seal on a stationary wireline, and the wiper strips excess grease from moving cable. These components should be described by function. A clean cable leaving the wiper does not prove integrity of the underlying dynamic seal. Conversely, grease at a designed return is different from uncontained well fluid.

Calculate what the clearance entry means
Suppose a measured cable OD is 0.312 in and a measured flow-tube bore is 0.317 in. The diametral clearance is bore minus cable OD, or 0.005 in. With perfectly concentric round parts, the radial gap would be half this, or 0.0025 in. Reporting only “0.005 clearance” without the basis invites a twofold error.
Those figures are an arithmetic example, not an acceptance criterion. Obtain the approved tube-to-cable range and measurement method for the specific tool and service. Record the actual diameter variation and cable condition. A single catalogue cable size does not capture wear, change in armor condition or differences along the length of the line.
For the cable and toolstring context, see wireline-conveyed perforating. Use the well integrity guide when tracing the envelope around the pressure-control head.

Why a pump gauge alone cannot confirm the seal
Different pressures can exist at the pump, within the supply hose, at the injection point and at the wellhead. Grease characteristic, temperature, flow, tube geometry, injection arrangement and movement of the cable affect the pressure distribution. An indication at a remote pump identifies only the pressure at that instrument at that time.
If grease consumption changes with similar wellhead pressure, compare like operating states. Record cable speed and direction, grease temperature, measured flow-tube ID and cable OD, supply and return indications, and any visible fluid at the head. Keep the drum and tube serial numbers alongside those measurements so the clearances can be reconstructed. An unnoticed change from a cold start to sustained movement can defeat comparison of two isolated gauge readings. Treat loss of containment according to the approved well-control response; a diagnosis from the readings alone cannot authorize continued operation.


What a replacement tube or cable changes
A different cable construction can require a different line-size kit, flow tubes, wiper and static pack-off. Verify connection compatibility and the actual pressure and temperature envelope of the complete stack. Match grease to the approved service and environmental conditions. The manufacturer defines the permissible combination of tubes and injection points for the anticipated well pressure and fluid.
Keep the setup record with the drum identification. When a second crew brings a replacement drum of identical nominal OD, it should be able to identify which measurements, certificates and acceptance checks depend on that specific cable. This makes a configuration change visible before the head is credited as available.
Quantify what two thousandths of bore wear changes
For ideal round sections, passage area is π/4 × (tube ID² − cable OD²). With the example dimensions it is approximately 0.00247 in². If the measured bore increases to 0.319 in while the cable remains 0.312 in, the area becomes about 0.00347 in², roughly 40% larger. The cable nominal size on the drum label has not changed.
This calculation compares geometry. It cannot predict the grease delivery pressure, leak rate or number of tubes required. Temperature, grease properties, actual cable construction, wear and the length of the effective restriction matter. Compare measured parts and the job conditions with the supplier’s approved combination, then interpret pump and head readings at their actual measurement points.
Field comparison
| Element | Its job | Evidence to record |
|---|---|---|
| Flow tube stack | Restrict flow around moving cable with injected grease | Tube bore, cable measurements and approved size combination |
| Stationary pack-off | Seal around stationary cable when designed for it | Model, size kit, operating condition and verification |
| Line wiper | Remove residual grease from cable | Correct element and collection condition |
| Injection manifold and check valve | Deliver grease and control reverse flow | Connection identification, orientation and test record |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Cable drum, nominal OD and measured OD range | |
| Tube bore, diametral clearance and OEM acceptance basis | |
| Grease grade, temperature, monitoring locations and returns route | |
| Static pack-off/wiper identification and verified barrier drawing revision |
Additional technical figures (5)





Questions from the field
Can the wiper substitute for the moving grease seal?
A wiper removes surplus grease. Its cleaning performance does not establish well-pressure containment.
What is the difference between diametral and radial clearance?
Diametral clearance is the bore minus cable diameter. In an ideal concentric geometry radial clearance is half that value.
Can a universal tube count be set from well pressure?
Use the manufacturer’s engineered selection for the actual cable, head, grease and service. Two assemblies at the same pressure may require different configurations.

Technical references
Well Intervention Pressure Control, training handout. PDF pp. 188–191, braided rig-up and grease seal.
NOV, Enviro Wireline Grease Injection Control Head. Flowtube, stationary pack-off and wiper descriptions.