A casing landing joint is the temporary joint above a hanger or its running tool that lets the rig handle and position the assembly from the floor. On a mandrel-hanger installation it also provides a convenient surface reference for predicting when the hanger shoulder will reach its seat. Understanding the measurement chain is more useful than memorizing a joint length.
Follow the assembly from the elevators to the casing
A conventional arrangement may have a handling joint at the top, a mandrel-hanger running tool below it, and the mandrel connected to the uppermost casing joint. Some designs connect the landing joint directly to the hanger. The equipment drawing establishes which arrangement applies. During running, the temporary handling assembly supports the string through its rated connections. Once landed and accepted, the permanent load path goes through the hanger and housing.
The term landing joint sometimes appears in other operations, including liner and subsea systems. The relevant question is what connects to its lower end on this job. A landing collar farther down a casing string, where a cement plug may land, has a different purpose. Mark each item by function on the space-out sheet.

Measure from a single rig-floor datum
Use one fixed horizontal rig-floor datum and identify the exact bearing feature on the hanger section. In a Cactus Wellhead installation example, the mark is measured from the top of the 45° hanger load shoulder. A measurement taken from the bottom of the taper would shift the predicted mark. Use the reference feature on the drawing for the supplied hanger. Measure the assembled distance from the hanger bearing face to a recognizable point on the landing joint. A tool manufacturer’s overall length can include thread overlap or use a different end reference from the physical face being measured. Count a made-up connection once.
Suppose the floor reference is 18.40 ft above the housing shoulder. The distance from the hanger bearing face to a witness mark is 20.10 ft on the made-up assembly. When the bearing faces coincide, the mark should be 20.10 − 18.40 = 1.70 ft above the floor reference. If the mark is moved to a point 0.50 ft farther up the joint, the predicted height becomes 2.20 ft. A mark moved upward gives a higher reading at the same landed position.
The casing running guide covers the wider operation. Use the casing tally to keep temporary landing equipment separate from components left in the well.

Read the mark and load together
If the mark is 2.30 ft above the plane rather than the expected 1.70 ft, the difference is 0.60 ft. Possible explanations include an unaccounted crossover, a changed reference, an incorrect as-built dimension, or contact above the intended shoulder. A hookload decrease alone cannot identify which explanation is correct. Use the approved program and the supplier’s verification method before recording the assembly as landed.
Changing the length above the hanger affects the visible reference. Changing casing length below the hanger can alter the shoe depth even if the hanger and its mark land at exactly the predicted elevation. That distinction matters when the casing program sets both a shoe target and a hanger elevation.


Preserve the evidence for the next shift
The handover should identify the as-run assembly and the temporary pieces recovered. Retain a dimensioned sketch with signs and datums, the predicted and observed mark positions, the recorded load response, and the supplier’s independent check. For a floating installation, vessel motion and compensation change how a floor reference can be interpreted. This fixed-floor example assumes a stationary frame.
Decide whether the landing mark discrepancy exceeds the measurement allowance
Assume the measured mark-to-bearing-face distance is 20.10 ±0.05 ft and the floor-to-shoulder distance is 18.40 ±0.07 ft. Taking pessimistic limits, the predicted mark is 1.70 ±0.12 ft, or 1.58–1.82 ft. Even a 2.30-ft observation with ±0.03 ft reading uncertainty starts at 2.27 ft, above the predicted interval. Those stated measurement errors cannot reconcile the observations.
Before treating the difference as a string-position error, reconcile the reference plane, crossover configuration, actual threaded makeup and whether the drawing dimensions are unloaded. Equipment below the hanger can alter shoe depth without moving this mark. Record the unresolved discrepancy and the independent landing evidence required by the specific hanger design.
Field comparison
| Change from worked example | Predicted mark at landing | Reason |
|---|---|---|
| As-built distance 20.10 ft | 1.70 ft above reference | 20.10 minus 18.40 |
| Reference mark 0.50 ft farther up the joint | 2.20 ft above reference | Greater mark-to-shoulder distance |
| Extra length below the hanger | 1.70 ft above reference | Shoe depth changes independently |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Identify floor reference, bearing face and witness mark on one drawing. | |
| Enter measured made-up lengths, thread reference, units and independent check. | |
| Separate shoe tally, mark observation, load signature and seal-test record. |
Additional technical figures (5)





Questions from the field
Is the landing joint permanently suspended from the wellhead?
In the temporary handling arrangement discussed here the joint is recovered. The permanent string support is the installed hanger.
Does a matching mark prove the packoff has sealed?
No. It indicates a geometrically consistent position. The specific packoff installation and pressure-test evidence establish its status.
Why use measured dimensions instead of the nominal joint length?
The prediction depends on the actual made-up distance between two physical reference surfaces, including any crossover and running tool.

Technical references
Mike Speer, Introduction to Wellhead Systems, SPE Petroleum Engineering Handbook, Volume II. Chapter 8, PDF pp. 350–354, sections 8.1.1–8.1.3 and Figs. 8.1–8.8.
Cameron mandrel hanger installation example in New Mexico Oil Conservation Division well record. Stage 4.0, Landing of Mandrel Hangers, well-specific reference to measured floor-to-shoulder distance and dedicated landing joint.