Hydraulic Workover Units: Read the Load Case Before the Capacity Plate

A hydraulic workover unit moves jointed pipe through a wellhead with a hydraulic jack and slip assemblies. On a live well, the unit may have to push pipe into the well as well as lift it out. A lifting-capacity figure answers only one of those questions. The job design must account for the direction of load, the string in the well and the pressure boundaries at that stage.

Follow the pipe load through the jack

Traveling slips move with the jack. Stationary slips transfer pipe load into the fixed structure while the traveling assembly changes position. On units that infer load from jack hydraulic pressure, that indication represents the load carried by the jack. Once the stationary slips carry the string, a low jack reading can coexist with substantial load on the fixed support. Record which slips carried the pipe when comparing a measured load with the calculated balance point. The Well Intervention Pressure Control handout describes this instrumentation on PDF p. 149. Gripping assemblies must suit the tubular dimensions and direction of load. Pressure-containing equipment performs a separate function below the work area. It seals around the string or isolates the well according to the approved configuration.

A hydraulic unit can also work on a dead well. Snubbing describes the operation of forcing the pipe into a pressurized well against an upward load. A conventional dead-well pulling job and a live-well snubbing job might use similar-looking jack equipment but impose different requirements on slips, pressure control, pipe guides and contingencies.

How the hydraulic jack carries pipe. Slips grip the tubular and transfer load through the jack and fixed support.
Functional side view of a jack, stationary and traveling slip sets, and the structural support. Pressure equipment is schematic.

Separate pipe-light, balance and pipe-heavy conditions

A short string exposed to wellhead pressure can have a net upward tendency. This is the pipe-light case. As suspended effective weight increases, the net load can cross a balance point and become downward, or pipe-heavy. Friction resists motion and reverses direction between running and pulling. The actual transition can appear as a band of loads rather than a single unmistakable depth on an indicator.

Consider the complete string state. Internal pressure, open or closed ends, changes in area, fluid contents, pipe displacement, deviation and seal friction can alter the force balance. A schedule built for a closed plug cannot be reused unchanged after opening a circulation path. Record the pressure-area assumptions alongside the plotted force envelope.

The snubbing unit guide identifies the jack and slip assemblies. Use the buoyed string-weight calculation to examine one contribution to an axial load balance.

Calculate the pressure-area term. Illustrative closed circular projected area, before friction and other job forces.
Illustrative closed circular projected area, before friction and other job forces.

Illustrative pressure force in a simplified load case

Assume a differential pressure of 2,000 psi acting across a closed circular projected area of diameter 2.000 in. Projected area is π × 2.000² ÷ 4 = 3.142 in². The pressure contribution is 2,000 × 3.142 = approximately 6,283 lbf upward. If the opposing effective downward string weight in this simplified model is 4,800 lbf, the remaining tendency is approximately 1,483 lbf upward before friction.

With the same pressure contribution and an effective downward weight of 8,000 lbf, the simplified net tendency becomes 1,717 lbf downward. These numbers illustrate a sign change. They do not size the unit. For the real well the engineer must derive the effective area from the actual seal and end conditions and evaluate additional loads, buckling, friction and applicable design margins.

One pressure, two weight cases. Compare the upward pressure contribution with each opposing downward weight.
Compare the upward pressure contribution with each opposing downward weight.
Snubbing unit running casing at a well
The hydraulic unit is installed above the well for a live-well tubular operation. Photo by Dannybsnubbin (CC BY-SA 4.0).

Work-floor components and their operating limits

ComponentFunction and limit to check
Power pack and control panelThe pack supplies hydraulic flow and pressure. The panel commands the jack and slips. Identify the jack, slip and well-pressure gauges separately.
Jack cylinders and traveling plateThe cylinders stroke the plate to move the gripped string. Verify pull and push capacity in the selected mode, plus available stroke.
Traveling slips and stationary slipsThe traveling slips grip the moving pipe. The stationary set transfers load to the frame between strokes. Verify insert size and the load direction each installed set can hold.
Guide tube and work windowThe guide limits sideways displacement of compressed pipe. The window gives access to handle larger tools. Check the largest tool OD and the allowable unsupported pipe length through the window.
Rotary and power tongsThe rotary turns the string. The tongs apply connection torque. Check rotary torque and speed for the planned duty, and tong gripping range and torque separately.
Stripper and BOP stackThe stripper seals around the moving string. BOP elements isolate the specified bore or pipe profile. Verify the pressure rating, sealing range and condition of the installed equipment.

For example, the BPC 340K unit card lists 340,000 lbf maximum pull, 166,000 lbf maximum push and 10 ft of jack stroke. Its stated through-bore changes from 11⅛ in. in snubbing configuration to 13⅝ in. in workover configuration. Check the restrictions through the complete installed stack before accepting a tool OD. The Well Control School snubbing chapter, figure 9.5, locates the components on a typical unit.

Working hours and preventive maintenance

Where Canada’s IRP 15 for Snubbing Operations applies, §15.3.4.4 specifies a structural inspection at 24,000 operating hours and tracks those hours from the last Level IV inspection. Without that log, it specifies a six-calendar-year inspection interval. Table 7 also lists component recertification periods, including six years for jack cylinders and slip bowls. These figures schedule inspection and recertification. They do not set the unit’s maximum continuous run or retirement age. Section 15.3.4.6 separately calls for unit inspection after rig-up and weekly during operation.

For the Texas International T28503 350-ton snubber slip assembly, the manufacturer’s maintenance schedule, OM019-A, p. 10 calls for shift/startup checks of fasteners, lubrication, hoses, insert condition, slip movement and retaining toes. At six months it calls for grip inspection and magnetic-particle examination of critical areas. Its annual scope includes a performance load test followed 24 hours later by magnetic-particle inspection. This schedule belongs to the slip assembly. Use the jack and power-pack manuals for their own service intervals. Secure the string and moving assembly, isolate stored energy and follow the maintenance procedure before hands-on work.

What to request from the unit provider

Ask for both the lift and push envelopes, the bore and stroke, the selected slips and guides, and the limits that apply to the proposed tubular. Compare each operating mode against the full load case at the jack and the allowable loads at its support. Work-window space must also suit tool-joint and bottomhole-assembly handling. A suitable maximum pull rating cannot resolve an insufficient work window or unsupported pipe length.

At handover, identify where the model predicts a change in force direction, which indications the crew will monitor and which changes require engineering review. A revised wellhead pressure, fluid condition or assembly diameter changes the basis of the force plot. Preserving those inputs makes differences between calculated and observed loads intelligible.

Estimate the balance point and state what could move it

Consider a vertical, uniform string contributing an illustrative 5.0 lbf of effective downward weight per foot. With the same 6,283-lbf upward pressure force and 1,000 lbf of other effective downward weight, the static balance length is (6,283 − 1,000) ÷ 5.0 ≈ 1,057 ft. Here “balance” means zero calculated net axial tendency in this simplified free-body diagram. It gives neither slip load capacity nor allowable unsupported length.

A change in pressure, fluid level, tool makeup or seal/end condition changes the balance point. Friction can give different pickup and slack-off readings on the two sides of balance. For unit selection, examine the direction and magnitude of the load through the proposed trip, then check both push and pull ratings, tubular stability and the structure receiving the reaction.

Field comparison

Review itemWhat it coversWhat can be missed
Lift capacityMaximum permitted pull in the specified modePush capacity and associated pipe stability
Push or snub capacityControlled downward force against upward tendencyCapacity of guides, slips and tubular
Work window and pressure-control borePhysical fit of pipe and assembliesTool joint, accessory and ram-position geometry
Support interfaceHow loads enter the underlying structureLimits on the tree, wellhead or support frame
Rig-assist hydraulic snubbing unit mounted for transport
This rig-assist configuration is packaged differently from the unit installed over the well. Photo by Ekimsnevets (Public domain).

What to record in the field

Check or recordJob-specific entry
Pipe/connection OD, effective area and end condition
Wellhead and internal pressures, fluid contents and effective weight basis
Predicted net load by depth and direction of travel
Lift/push envelopes, structural limits and review trigger
Additional technical figures (5)
A changing net-load direction. Treat upward as positive in this simplified force balance.
Treat upward as positive in this simplified force balance.
What the capacity plate cannot settle. Request the rating for the relevant mode, geometry and load path.
Request the rating for the relevant mode, geometry and load path.
Friction changes with direction. Two moving-load traces can bracket different tendencies at the same depth.
Two moving-load traces can bracket different tendencies at the same depth.
When a pressure path changes. A changed string state can invalidate a load schedule calculated earlier.
A changed string state can invalidate a load schedule calculated earlier.
Follow a unit-selection review. The missing input in one row cannot be replaced by a large rating in another.
The missing input in one row cannot be replaced by a large rating in another.

Questions from the field

Is unit size the same as snubbing capacity?

Consult the model-specific load chart. The nominal rating may describe lifting and need not equal the available push capacity.

Can pipe be light and still have positive weight?

Yes. Pipe-light describes the net tendency when upward forces exceed the opposing effective weight.

Why record running and pulling loads separately?

Friction opposes movement. A single weight reading can hide the difference between the two travel directions.

Workover rig arranged for a snubbing job
The mast and workover rig show the additional structure present on a rig-assisted job. Photo by Joshua Doubek (CC BY-SA 3.0).

Technical references

Well Intervention Pressure Control, training handout. PDF pp. 147–151 and 174–176, hydraulic jack and pipe-force examples.

SLB Energy Glossary, Pipe light. Definition of pipe-light condition.

SLB Energy Glossary, Traveling slips. Traveling slip position and load direction.

Well-control training reference on snubbing force balance.