LMRP stands for lower marine riser package. It sits at the bottom of the marine drilling riser and forms the upper package of a two-section subsea blowout preventer (BOP) stack. Its lower connector mates with the top of the lower stack. That joint is a different interface from the connector between the lower stack and the subsea wellhead.
Read the stack from the riser downward
Starting at the bottom of the riser, identify the riser adapter and flex or ball joint in the applicable stack arrangement. The joint accommodates angular movement between the riser and subsea equipment. The LMRP commonly carries an annular preventer, subsea control pods and connections or jumpers for choke, kill and auxiliary services. The number, position and ownership of individual components differ between stacks.
Beneath the LMRP connector is the lower stack with its ram preventers and related equipment. The lower stack connects to the wellhead through a separate wellhead connector. An annular can be assigned to more than one location in the complete stack, depending on design. Use the package split and connector faces to identify the LMRP on a drawing. Counting from the first annular symbol can put the boundary in the wrong place.

Map the paths that cross the split
The central bore is only the most visible crossing. Choke and kill circuits, auxiliary lines and hydraulic or control interfaces can also span the separation plane. Identify where every crossing terminates, what disconnects with the riser and which pressure-containing hardware remains below. A connector indication gives information about the mechanical connection. It does not establish the state of every adjacent fluid path.
The control pods typically travel with the LMRP. Some control provisions or emergency functions exist on the lower package, depending on configuration. Questions about what can still be operated after separation must be answered from the actual control schematics and verified design. The distinction matters when writing a barrier diagram or describing what a subsea camera can confirm.
The marine drilling riser terminates on the stack through the upper package. The BOP ram guide identifies examples of closure elements that can remain on the lower stack.

Example: translating a vague subsea status report
A handover states “connector released; lower stack visible.” There are two large connectors on the typical stack drawing. Clarify which connector supplied the indication, the timestamp and the camera view. If the report concerns the LMRP connector, the LMRP is the riser-side package and the lower stack can remain latched to the wellhead. If it concerns the wellhead connector, the mechanical boundary is elsewhere. The phrase alone cannot distinguish these states.
Now annotate separate lines for lower-stack barrier status, bore contents and choke and kill paths. Identify the source of each status, such as a named position indication, trend or approved test record. A video showing physical separation supports a geometry statement. It cannot show a pressure differential holds across a closed ram.
This exercise belongs in equipment familiarization and shift handover. The approved rig-specific emergency and well-control sequences establish the order, timing and verification of actual actions. An LMRP anatomy drawing does not encode those controls.


Distinguish EDS, autoshear and deadman in an event record
The U.S. offshore definitions in 30 CFR § 250.734 distinguish three functions. The emergency disconnect sequence is designed for manual activation to shut in the wellbore and disconnect the LMRP. Autoshear addresses wellbore shut-in following LMRP disconnect. Deadman provides automatic shut-in when both subsea control pods simultaneously lose hydraulic supply and the ability to transmit signals. Paragraph (a)(6) requires all three systems for dynamically positioned rigs. For moored rigs it specifies autoshear and deadman. Other jurisdictions and the installed rig configuration can differ.
For an event review, separate the command or triggering condition, the indication at the connector and the evidence of lower-stack closure. A physical disconnect alone does not establish which safety function initiated or completed. Use the configured cause-and-effect document and the time-stamped indications before reporting which pressure boundary remained available.
What does a post-repair LMRP relatch establish?
A mechanical relatch brings several interfaces together. A pressure test of the connector gasket challenges the main riser connection. Testing the choke and kill stabs challenges separate fluid paths. Pod function tests challenge the controls. Record the interface for each result. For a U.S. Outer Continental Shelf operation suspended for subsea BOP repairs, 30 CFR §250.734(b) sets out the applicable tests and approvals before work resumes, including the provisions for an LMRP relatch in paragraph (b)(3).
Field comparison
| Feature | Typical location or purpose | Evidence to identify it |
|---|---|---|
| Riser adapter and flex joint | Transition to marine riser and angular accommodation | Riser and stack assembly drawing |
| LMRP connector | Separates upper package from lower stack | Tag and mating interface at package split |
| Lower-stack rams | Well-control elements below the split | Ram map and barrier state |
| Wellhead connector | Secures lower stack to the wellhead | Separate tag and wellhead interface drawing |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Mark upper package, lower stack and wellhead on a single stack drawing. | |
| Label both large-bore connectors and their individual status signals. | |
| Trace each choke, kill and auxiliary crossing of the upper/lower split. | |
| List separate evidence for separation and the pressure barriers remaining on the well. |
Additional technical figures (5)





Questions from the field
Why is it called lower when it sits at the top of the BOP stack?
Lower refers to its position at the bottom of the marine riser. Relative to the two-section BOP assembly, the LMRP is the upper package.
Does removing the LMRP remove the entire BOP?
A separation at the LMRP connector leaves the lower stack in place when its wellhead connector remains latched. A full-stack recovery uses a different boundary.
Is the LMRP the emergency disconnect sequence?
The LMRP is hardware. An emergency disconnect sequence is a configured set of control functions for a specific system and operating state.

Technical references
IADC Lexicon, Lower Marine Riser Package. Definitions attributed to API Specification 16Q and ISO 13624-1.
IADC Drilling Manual, Floating Drilling Equipment and Operations. Printed p. FD-65, Fig. FD-52, typical deepwater BOP stack schematic.
Heriot-Watt University, Drilling Engineering, Subsea Drilling. §2.8, printed chapter p. 12, Fig. 8.