Wireline intervention uses a winch and a wire or cable to carry tools through the wellhead into a completed well. It can recover a plug, shift a sleeve or record conditions at depth without pulling the completion. The first planning question is what evidence the operator needs back at surface. A recovered plug, a pressure file and a live log are three different deliverables.
Choose the wire from the job objective
Conventional slickline is a single smooth wire. A mechanical tool can engage a profile, deliver a jar impact or carry a battery-powered memory gauge. The operator reads depth and surface tension while running. A memory gauge can acquire useful measurements during the run, but its data normally become available after recovery. Digital slickline systems have different communication capabilities and should be specified by the service actually supplied.
Braided mechanical line can provide greater tensile capacity than a comparable small slickline. Electric line adds one or more conductors for compatible powered tools and telemetry. An armored cable and a smooth wire can require different surface pressure-control heads. Writing only “wireline unit” on the program leaves the pressure-control provider and logging contractor free to arrive with incompatible equipment.

Draw the complete toolstring at its longest
Sketch from cablehead or rope socket to the bottom of the payload. Identify the maximum outside diameter, rigid lengths, fishing neck and release arrangement. Compare the actual profile of the string with every restriction on the latest completion drawing. A gauge ring going through a nipple establishes something about diameter. A long, rigid assembly can still bridge a bend that the short gauge passed.
Check usable lubricator space against the assembled length, including the item being retrieved. Effective length depends on where the assembly must clear a closure element and where the catcher or other internal equipment takes up space. A stack’s catalogue length alone is a poor measure of recovery clearance. Agree who will confirm the space available if a retrieved item returns attached below the tool.
Compare the access evidence from a slickline gauge run with the depth reference from a casing collar locator log. They answer different questions about whether a tool can reach its target.

A depth wheel can be right and the working point still wrong
Assume a horizontal reference plane at the wellhead, measured depth increasing downward and an electric-line collar-locator reference point 8 ft above the working point of a tool. If correlation places that sensor at 7,412 ft MD, the working point is at 7,420 ft MD, assuming the documented 8 ft spacing along hole. If the logging unit already applies the tool offset, adding it again puts the reported point 8 ft too deep.
Enter raw sensor depth, correlation shift, tool offset and final working-point depth in separate fields. Record the datum and whether the displayed channel already applies a correction. In an interval with similar collar spacing, match several features to a reference pass before assigning an absolute depth. A surface tension change can support the interpretation, but alone it cannot identify a particular nipple.


Decide what counts as a successful run
For a plug recovery, identify the physical parts expected at surface and the evidence that the intended completion profile is available afterward. For a survey, define the depth interval, station coverage and data-quality checks. For a shifting job, agree how the new sleeve position will be confirmed. Moving line to the planned depth proves deployment only.
The end-of-run record should let a different crew reconstruct the job. Retain line type, tool sketch, correlated depths, suspicious restrictions, pressure-control configuration and the as-returned condition. A subsequent crew can then distinguish a repeat obstruction from a new one and can tell which part of the previous operation was actually verified.
Separate a fixed tool offset from pass-dependent depth error
A collar picked at 7,412.0 ft on one pass and 7,415.0 ft on a repeat differs by 3.0 ft. Adding the same +8.0-ft sensor offset yields 7,420.0 and 7,423.0 ft for the working point. The separation survives unchanged. Altering the tool drawing to make the two depths agree would corrupt a known mechanical dimension.
Compare the raw correlation traces, direction of travel, tension history, depth encoder and reference-log datum. A uniform shift across several recognizable features suggests a different explanation from a discrepancy that grows with depth or changes on reversing direction. Document the accepted correlation and its uncertainty before assigning the tool to a short target interval.
Field comparison
| Work required | Candidate conveyance | Evidence to request |
|---|---|---|
| Retrieve a known mechanical plug | Slickline with a compatible pulling tool | Recovered plug identification and condition |
| Recover a high-load object | Engineered braided-line or alternative package | Full tensile/load path and release review |
| Observe and adjust a survey live | Electric line and telemetry-capable instruments | Calibrated depth-correlated measurement channels |
| Record a pressure history for later analysis | Memory gauge on a suitable conveyance | Recovered gauge file, clock check and depth history |

What to record in the field
| Check or record | Job-specific entry |
|---|---|
| Target, datum and working point | |
| Minimum restriction, maximum string OD and longest rigid section | |
| Usable lubricator length with recovered item, line type and pressure-control configuration | |
| Correlation evidence, return evidence and release or recovery plan owner |
Additional technical figures (5)





Questions from the field
Can slickline record pressure?
Yes. A memory gauge records pressure against its own clock. Match that file to the surface time–depth record after recovery. At a steady 30 ft/min, a 10-second clock offset would assign a moving measurement about 5 ft away from its actual position. During a stationary survey the same offset shifts the event time. Keep the start and end clock comparisons and the original surface depth file. The WellRay memory logging system illustrates how the two records are acquired.
Is braided line always electric line?
Braided cable can have a conductor or be entirely mechanical. Specify construction and electrical service explicitly.
Why can two depth records disagree?
They may use different datums, tool reference points, cable corrections or correlation passes. Reconcile those fields before interpreting the numerical difference.

Technical references
Well Intervention Pressure Control, training handout. PDF pp. 179–186, wireline classification and surface equipment.
Cased Hole Evaluation Guidelines, EP 93-1585. PDF p. 137, section 5.16, deployment.
SLB Energy Glossary, Wireline. Intervention and logging definitions.
Schlumberger wireline depth measurement and correlation procedures, filed with the U.S. EPA.