Coiled Tubing Sand Cleanout: Fluids & Calculations

Coiled tubing sand cleanout removes accumulated fill by loosening it, entraining it in a circulating fluid and carrying it through the return path to surface. In addition, a successful treatment needs enough transport capacity throughout the well, a fluid compatible with the completion and formation, and operating pressures that preserve the planned circulation system. However, …

Read more

Tubing Movement Calculations: Piston, Ballooning, Buckling and Temperature Effects

Tubing movement calculations estimate how much a completion string changes its end-to-end length when pressure, temperature or mechanical loading changes. For tubing that can slide through a packer seal bore, the result helps determine the required movement range. For anchored tubing, the same imposed changes can generate additional tubing and packer loads. Establishing the actual …

Read more

Drill Collar Specifications

To select the proper drill collar for the bottom hole assembly, we should understand what is the drill collar specifications. Generally, drill collars are identified by the following parameters: Drill Collar Sizes The hole size and bit program will determine the best drill collar size, but the collars selected usually have the largest OD and …

Read more